Prior Awarded Bids

  • RFP/IFB/RFQ/RFI

    • 21-01  Owner's Representative Services - BEST Grant Awards - Two New Schools
      • Awarded:  Vanir Construction Management Inc
    • 21-02  Furniture, Fixtures & Equipment (FF&E) - East/Centennial
      • Awarded:  OS Schools/Office Scapes
    • 21-03  D/B HVAC System Replacement - PAA
      • Awarded:  Industrial Plumbing & Heating Co
    • 21-04  D/B HVAC System Replacement - South HS
      • Awarded:  Industrial Plumbing & Heating Co
    • 21-05  Architect/Engineering Services - Two new BEST Schools
      • Awarded:  RTA/MOA
    • 21-06  CMGC Services - Franklin School of Innovation
      • Awarded:  Nunn Construction Inc
    • 21-07  CMGC Services - Sunset Park Elementary
      • Awarded:  Nunn Construction Inc
    • 21-08  D/B Electrical Distribution System Replacement - PAA
      • Awarded:  Pueblo Electrics Inc
    • 21-09  Uninterruptible Power Supply (UPS) Units
      • Awarded:  Graybar
    • 21-10  Design/Build Cafeteria Lighting System Replacement at South High School
      • Awarded:  Morton Electric
    • 21-11  Third Party Inspection & Materials Testing Services
      • Awarded:  Ground Engineering Inc/Kumar & Associates inc
    • 21-12  Building Commissioning Services
      • Awarded:  Iconergy
    • 21-13  Interactive Flat Panel Display
      • Awarded:  CounterTrade Products Inc
    • 21-14  Design/Build - Electrical Distribution System Replacement at Central High School
      • Awarded:  Pueblo Electrics Inc
    • 21-15  Virtual Online School Integrated Curriculum
      • Awarded:  Edgenuity
    • 21-16  Design/Build - Parent Drive Loop at Park View Elementary School
      • Awarded:  Martin Marietta Materials
    • 21-17  K-5 Music Curriculum
      • Awarded:  Quavered
    • 21-18  High School Math Curriculum
      • Awarded:  McGraw Hill
    • 21-19  Design/Build - Plumbing System Repairs/Select Replacements at Central High School
      • Awarded:  Industrial Plumbing & Heating
    • 21-20  Online Assessment Programs
      • Awarded: iStation and NWEA
    • 21-21  Building Commissioning Services - Franklin/Sunset Park
      • Awarded:  PCD Engineering
    • 21-22  Food Service Management Company
      • Awarded:  Southwest Food Excelence  (SFE)
    • 21-23  CM/GC Services - New K-8 School
      • Awarded:  HW Houston/GE Johnson
    • 21-24  Design/Build - Roof Replacement at Central High School
      • Awarded:  Community Preservation & Management/R3NG
    • 21-25  Design/Build - Roof Recover at Beulah Heights
      • Awarded:  Douglass Colony Group
    • 21-26  Design/Build - Installation of Owner Provided CRAC HVAC Units at Data Center
      • Awarded:  Colorado Mechanical Systems LLC
    • 21-28  Design/Build - Installation of Owner Provided Boiler Units at Park View Elementary School
    • 21-29  Water Main Relocation - Sunset Park Elementary
      • Awarded:  K.R. Swerdfeger Construction Inc
    • 22-01  Small Job Asbestos Abatement Contracting
      • Awarded:  Acument Environmental Services, Advanced Remediation Services, All-Phase Environmental Consultants, Belfor Environmental, BluSky Restoration Contractors, Colorado Hazard Control, Cyclone Kleen Up, and Orion Environmental
    • 22-02  ELG Consultant
      • Awarded:  Kristy Khoury Consulting
    • 22-03  Unarmed Construction Site Security
      • Awarded:  TNT Security Inc.
    • 22-04  Musical Instrument Cleaning & Repair Services
      • Awarded: Colorado Institute of Musical Instrument Technology (COMIT)
    • 22-05  ELG Consultant
      • Awarded:  Youngren Consulting
    • 22-07  Third Party Inspection & Materials Testing - Sunset Park/Franklin School of Innovation
      • Awarded:  Ground Engineering Consultants Inc
    • 22-08  FF&E - Sunset Park Elementary & Franklin School of Innovation
      • Awarded:  TBD
    • 22-09  Mechanical, Electrical and Plumbing Engineering Services - Multiple Schools
      • Awarded:  TBD
    • 22-10  HVAC System Replacement at Risley International
      • Awarded:  Industrial Plumbing & Heating
    • 22-11  HVAC System Replacement at Heritage Elementary School
      • Awarded:  Industrial Plumbing & Heating
    • 22-12  Design/Build - Sewer System Repairs at Central High School Gymnasium
      • Awarded:  Flow Right PHI
    • 22-13  Beverage Equipment & Services
      • Awarded:  Swire Coca-Cola
    • 22-14  Design/Build - Partial Roof Replacement at Bradford Elementary School
      • Awarded:  Colorado Front Range Roofing
    • 22-15  CMGC Services for HVAC System Replacement at Bradford Elementary School
      • Awarded:  Industrial Plumbing &Heating/HW Houston Construction
    • 22-16  CMGC Services for HVAC System Replacement at Belmont Elementary School
      • Awarded:  Industrial Plumbing &Heating/HW Houston Construction
    • 22-17  CMGC Services for HVAC System Replacement at South Park Elementary School
      • Awarded:  Industrial Plumbing &Heating/HW Houston Construction
    • 22-18  CMGC Services for HVAC System Replacement at Heaton Middle School
      • Awarded:  Industrial Plumbing &Heating/HW Houston Construction
    • 22-19  Design/Build - Replace Site Water Supply System at South High School
      • Awarded:  K.R. Swerdfeger Construction
    • 23-01  Design/Build - Partial Electrical Distribution System Upgrade at Belmont Elementary School 
      • Awarded:  Morton Electric Inc
    • 23-02  Design/Build - Partial Electrical Distribution System Upgrade at South Park Elementary School
      • Awarded:  Pueblo Electrics Inc
    • 23-03  Domestic Hot Water Piping Replacement at Pueblo Academy of Arts  
      • Awarded:  American Mechanical Services